Fire fighting contractor · Kozhikode, Kerala

Fire Fighting Contractor in Calicut

Fire Remedy Systems (FRS) designs, installs and maintains fire hydrant, wet riser, sprinkler and fire pump systems for buildings in Calicut (Kozhikode). FRS installed the fire fighting system for the 1,500-capacity Mega Hostel at NIT Calicut, for CPWD Palakkad.

Since 1983

CPWD Class-1 (Composite)

ISO 9001:2015

600+ projects

Home → Services → Fire Fighting Systems → Calicut

At a glance

FRS in Calicut: key facts

Projects in Calicut

NIT Calicut Mega Hostel: fire fighting system for a 1,500-capacity hostel, for CPWD Palakkad

Other projects in Kerala

STPI Office Building, Technopark, Thiruvananthapuram; Cochin Special Economic Zone, Kochi

Systems we install

Hydrants, wet risers, sprinklers, fire pump rooms, fire alarm and detection, public address

Maintenance

Annual maintenance contracts, including systems installed by other contractors

Fire authority

Kerala Fire and Rescue Services

Governing law

Kerala Municipality Building Rules, 2019 (fire NOC table re-issued October 2025)

Owner's recurring duty

Final NOC renewed every year, or for up to five years at a time (two for hazardous buildings)

Company

Fire Remedy Systems (FRS), head office New Delhi, established 1983

Enlistment

CPWD Class-1 (Composite), tenders up to ₹50 crore; ISO 9001:2015

Enquiries

[email protected]

Information on this page was checked on 17 November 2026.

Track record

Our projects in Kerala

Education

NIT Calicut Mega Hostel

Kozhikode

Fire fighting system for the 1,500-capacity hostel.

Client: CPWD Palakkad

SEZ

Cochin Special Economic Zone (CSEZ)

Kakkanad, Kochi

Fire safety and ECM works.

Client: Cochin SEZ Authority

Commercial

STPI Office Building, Technopark

Thiruvananthapuram

Balance civil and interior works, with fire, electrical, ELV, HVAC, solar and STP under a single contract.

Client: STPI

More of our projects are listed on our Clients page.

Services

What FRS installs in Calicut buildings

Wet risers and hydrants

Wet risers bring water to a landing valve on every floor. Yard hydrants on a ring main serve the fire brigade at ground level. FRS installed the fire fighting system for the NIT Calicut Mega Hostel.

Automatic sprinklers

Each sprinkler head opens on its own when it reaches its rated temperature, so only the heads above a fire discharge water.

Fire pump rooms

An electric main pump, a diesel standby pump and a jockey pump that keeps the system pressurised. The main pumps start automatically when pressure falls.

Fire alarm and detection

Addressable detectors and manual call points report to a panel that shows the exact device in alarm, with public address and voice evacuation.

Repair and maintenance (AMC)

Survey and repair of systems that are not working, then scheduled inspection and testing of pumps, valves, sprinklers and alarm panels, with service records after every visit.

Getting started

How to get a quote

Send us

✓

The building’s address and use (housing, offices, hospital, hotel, warehouse)

✓

Height and number of floors, including basements

✓

Built-up area

✓

Drawings, and the tender or BOQ if you have one

✓

Where you are: new building, fire NOC pending, or an existing system that needs repair or AMC

Send your requirement

What happens next

1

An FRS engineer surveys the site and checks the drawings against the fire approval conditions.

2

You receive an itemised quotation.

3

Before anything is ordered, we send you data sheets for the pumps, valves, sprinklers and panels for approval.

4

A project manager and engineers stay on site for the installation and send weekly progress reports.

5

We test and commission each system, then hand over the drawings and records.

FAQs

Questions from Calicut building owners

Under the Kerala Municipality Building Rules (table re-issued October 2025), residential, lodging, educational, hospital, office, commercial, industrial and storage buildings need one above 1,000 sq m of built-up area or 15 m of height, and assembly, hazardous and multiplex buildings always do. The fire department’s own procedure reads the first test as area and height together, so check with it if your building crosses only one limit. Smaller buildings in that group, of 300 to 1,000 sq m, file a self-declaration instead.
The Kerala Fire and Rescue Services department. Kozhikode is a municipal corporation, so the Kerala Municipality Building Rules, 2019 apply, and applications are made online on the department’s NOC portal, noc.fire.kerala.gov.in.
Before construction, the owner obtains a site NOC, which goes with the building permit application. The contractor installs and commissions the fire protection systems and hands over drawings, data sheets and test records; the department then inspects the building and issues the final NOC, which fire officials describe as a prerequisite for the occupancy certificate.
Not necessarily. A Home Department order of 4 August 2025 lets non-hazardous buildings renew for up to five years by paying the annual fee for each year in advance, and hazardous buildings for two years at twice the fee, from their next renewal date. The department’s FAQ still describes yearly renewal, so confirm the option when you renew.
FRS installed the fire fighting system for the 1,500-capacity Mega Hostel at NIT Calicut, for CPWD Palakkad. Elsewhere in Kerala it carried out the fire safety and ECM works at the Cochin Special Economic Zone in Kakkanad and completed the STPI Office Building at Technopark, Thiruvananthapuram, and it takes up installation and maintenance work across the state.
Yes. We start with a condition survey of the pumps, risers, sprinklers and alarm panels, list what is not working, and quote for the repairs and an annual maintenance contract. Service records are provided after every visit, so the maintenance history is ready when the NOC is renewed.

Planning a fire fighting system for a building in Calicut?

Send your drawings or a short description of the building. We will arrange a site survey and an itemised quotation.

Get a quote →