Fire fighting contractor · Kolkata, West Bengal
Fire Fighting Contractor in Kolkata
Fire Remedy Systems (FRS) designs, installs and maintains fire hydrant, wet riser, sprinkler and fire alarm systems. Our West Bengal branch on C.R. Avenue, Kolkata, handles work across the state. In West Bengal, FRS has worked at IISER Kolkata in Mohanpur and inside the Metal & Steel Factory at Ishapore for the Ordnance Factory Board.
Since 1983
CPWD Class-1 (Composite)
ISO 9001:2015
600+ projects
Home → Services → Fire Fighting Systems → Kolkata
At a glance
FRS in Kolkata: key facts
Office
West Bengal branch, 2E, Ganapati Chambers, 122/A C.R. Avenue, Kolkata 700073
Area covered
Kolkata, Howrah and the rest of West Bengal
Projects in West Bengal
IISER Kolkata, Mohanpur (fire safety and ECM works); Metal & Steel Factory, Ishapore (fire safety works, for the Ordnance Factory Board)
Clients in West Bengal
IISER Kolkata, Ordnance Factory Board, WEBEL
Systems we install
Hydrants, wet risers, sprinklers, fire pump rooms, fire alarm and detection, public address
Maintenance
Annual maintenance contracts, including systems installed by other contractors
Fire authority
West Bengal Fire and Emergency Services
Governing law
West Bengal Fire Services Act, 1950 and the Fire Prevention and Fire Safety Rules, 2003
Owner's recurring duty
Fire Safety Certificate renewed every 3 years (5 for listed low-hazard buildings)
Enlistment
CPWD Class-1 (Composite), tenders up to ₹50 crore; ISO 9001:2015
Enquiries
Information on this page was checked on 17 November 2026.
Track record
Our projects in West Bengal
Education
IISER Kolkata
Mohanpur, West Bengal
Fire safety and ECM works.
Client: IISER
Defence
Metal & Steel Factory
Ishapore, West Bengal
Fire safety works inside an ordnance facility.
Client: Ordnance Factory Board
More of our projects are listed on our Clients page.
Services
What FRS installs in Kolkata buildings
Wet risers bring water to a landing valve on every floor. Yard hydrants on a ring main serve the fire brigade at ground level.
Each sprinkler head opens on its own when it reaches its rated temperature, so only the heads above a fire discharge water.
An electric main pump, a diesel standby pump and a jockey pump that keeps the system pressurised. The main pumps start automatically when pressure falls.
Addressable detectors and manual call points report to a panel that shows the exact device in alarm, with public address and voice evacuation.
Survey and repair of systems that are not working, then scheduled inspection and testing of pumps, valves, sprinklers and alarm panels, with service records after every visit.
Getting started
How to get a quote
Send us
✓
The building’s address and use (housing, offices, hospital, hotel, warehouse)
✓
Height and number of floors, including basements
✓
Built-up area
✓
Drawings, and the tender or BOQ if you have one
✓
Where you are: new building, fire NOC pending, or an existing system that needs repair or AMC
What happens next
1
An engineer from the West Bengal branch surveys the site and checks the drawings against the fire approval conditions.
2
You receive an itemised quotation.
3
Before anything is ordered, we send you data sheets for the pumps, valves, sprinklers and panels for approval.
4
A project manager and engineers stay on site for the installation and send weekly progress reports.
5
We test and commission each system, then hand over the drawings and records.
FAQs
Questions from Kolkata building owners
Sources for the fire approval answers
WBF&ES: Fire Safety Recommendation (procedure, fees and application)
WBF&ES Order 1591 (December 2025): Technical Expert Committees
Silpasathi: fire service timelines
Silpasathi: Fire Safety Certificate user guide
Silpasathi: renewal of Fire Safety Certificate user guide
Notification 261 (25 May 2026): five-year validity for low-hazard buildings
Notification 1488 (29 October 2026), with orders on self-certification and third-party inspection
Millennium Post (PTI): KMC-area fire clearance threshold raised to 15.5 m (June 2022)
Rules change. Confirm the current position with the fire authority before you apply. Last checked: 17 November 2026.
Planning a fire fighting system for a building in Kolkata?
Send your drawings or a short description of the building. The West Bengal branch will arrange a site survey and an itemised quotation.
Get a quote →