Fire fighting contractor · Chandigarh
Fire Fighting Contractor in Chandigarh
Fire Remedy Systems (FRS) designs, installs and maintains fire hydrant, wet riser, sprinkler and fire pump systems. Our Chandigarh branch in Mariwala Town handles work in Chandigarh and the surrounding parts of Punjab and Haryana. FRS holds Grade-I contractor enlistment with Panchayati Raj Public Works, Punjab.
Since 1983
CPWD Class-1 (Composite)
ISO 9001:2015
600+ projects
Home → Services → Fire Fighting Systems → Chandigarh
At a glance
FRS in Chandigarh: key facts
Office
Chandigarh branch, Shop No. 2247, First Floor, Mariwala Town, Makhan Majra, Chandigarh 160101
Area covered
Chandigarh, Mohali, Panchkula and the rest of Punjab and Haryana
Project in the region
Pt. Deen Dayal Upadhyaya University of Health Sciences, Karnal: fire safety and ECM works, for the Government of Haryana
Punjab enlistment
Contractor Grade-I, Panchayati Raj Public Works, Punjab
Systems we install
Hydrants, wet risers, sprinklers, fire pump rooms, fire alarm and detection, public address
Maintenance
Annual maintenance contracts, including systems installed by other contractors
Fire authority
Fire and Rescue Services Branch, Municipal Corporation Chandigarh (Chief Fire Officer)
Governing law
Haryana Fire and Emergency Services Act, 2022, as extended to Chandigarh in May 2026
Owner's recurring duty
Licensed-agency certificate every July that the fire system works; certificate renewed every 5 years
Enlistment
CPWD Class-1 (Composite), tenders up to ₹50 crore; ISO 9001:2015
Enquiries
Information on this page was checked on 17 November 2026.
Track record
Selected projects in North India
Healthcare
Pt. Deen Dayal Upadhyaya University of Health Sciences
Karnal, Haryana
Fire safety and ECM works.
Client: Govt. of Haryana
Government
Parliament House Annexe
New Delhi
Fire fighting and fire alarm works.
Client: CPWD
Healthcare
CAPFIMS
Maidan Garhi, New Delhi
Addressable fire alarm system; internal and external electrical works.
Client: L&T Construction
More of our projects are listed on our Clients page.
Services
What FRS installs in Chandigarh buildings
Wet risers bring water to a landing valve on every floor. Yard hydrants on a ring main serve the fire brigade at ground level.
Each sprinkler head opens on its own when it reaches its rated temperature, so only the heads above a fire discharge water.
An electric main pump, a diesel standby pump and a jockey pump that keeps the system pressurised. The main pumps start automatically when pressure falls.
Addressable detectors and manual call points report to a panel that shows the exact device in alarm, with public address and voice evacuation.
Survey and repair of systems that are not working, then scheduled inspection and testing of pumps, valves, sprinklers and alarm panels, with service records after every visit.
Getting started
How to get a quote
Send us
✓
The building’s address and use (housing, offices, hospital, hotel, warehouse)
✓
Height and number of floors, including basements
✓
Built-up area
✓
Drawings, and the tender or BOQ if you have one
✓
Where you are: new building, fire NOC pending, or an existing system that needs repair or AMC
What happens next
1
An engineer from the Chandigarh branch surveys the site and checks the drawings against the fire approval conditions.
2
You receive an itemised quotation.
3
Before anything is ordered, we send you data sheets for the pumps, valves, sprinklers and panels for approval.
4
A project manager and engineers stay on site for the installation and send weekly progress reports.
5
We test and commission each system, then hand over the drawings and records.
FAQs
Questions from Chandigarh building owners
Sources for the fire approval answers
Chandigarh Administration press release (6 May 2026)
Municipal Corporation Chandigarh: Fire and Rescue Services Branch
Municipal Corporation Chandigarh: online services
Municipal Corporation Chandigarh: fire safety certificate charges, 2025
The Tribune: UT notifies new fire safety rules (November 2026)
Punjab Fire and Emergency Service Act, 2024 (gazette copy, PRS Legislative Research)
Haryana Fire and Emergency Services Act, 2022 (gazette copy, PRS Legislative Research)
Rules change. Confirm the current position with the fire authority before you apply. Last checked: 17 November 2026.
Planning a fire fighting system for a building in Chandigarh?
Send your drawings or a short description of the building. The Chandigarh branch will arrange a site survey and an itemised quotation.
Get a quote →