Fire fighting contractor · Noida, Uttar Pradesh

Fire Fighting Contractor in Noida

Fire Remedy Systems (FRS) designs, installs and maintains fire hydrant, wet riser, sprinkler and fire pump systems for buildings in Noida and Greater Noida. FRS installed the fire fighting system at the Noida Special Economic Zone (NSEZ) for NBCC.

Since 1983

CPWD Class-1 (Composite)

ISO 9001:2015

600+ projects

Home → Services → Fire Fighting Systems → Noida

At a glance

FRS in Noida: key facts

Projects in Noida

Noida Special Economic Zone (NSEZ): fire fighting system, for NBCC

Other projects in Uttar Pradesh

Institute of Medical Sciences BHU, Banaras Hindu University and Kendriya Vidyalaya DLW, all in Varanasi, for CPWD

Systems we install

Hydrants, wet risers, sprinklers, fire pump rooms, fire alarm and detection, public address

Maintenance

Annual maintenance contracts, including systems installed by other contractors

Fire authority

Uttar Pradesh Fire and Emergency Services (Gautam Buddh Nagar district for most buildings)

Governing law

Uttar Pradesh Fire and Emergency Services Act, 2022 and Rules, 2024

Owner's recurring duty

Maintenance declaration every January and July, certified by a licensed agency; renewal applied for one month before expiry

Company

Fire Remedy Systems (FRS), head office New Delhi, established 1983

Enlistment

CPWD Class-1 (Composite), tenders up to ₹50 crore; ISO 9001:2015

Enquiries

[email protected]

Information on this page was checked on 17 November 2026.

Track record

Our projects in Noida and the region

SEZ

Noida Special Economic Zone (NSEZ)

Noida

Fire fighting system.

Client: NBCC Ltd.

Healthcare

CAPFIMS

Maidan Garhi, New Delhi

Addressable fire alarm system; internal and external electrical works.

Client: L&T Construction

Healthcare

Institute of Medical Sciences, BHU

Varanasi

Wet riser and drinking water pump system.

Client: CPWD

More of our projects are listed on our Clients page.

Services

What FRS installs in Noida buildings

Wet risers and hydrants

Wet risers bring water to a landing valve on every floor. Yard hydrants on a ring main serve the fire brigade at ground level. FRS installed the fire fighting system at NSEZ.

Automatic sprinklers

Each sprinkler head opens on its own when it reaches its rated temperature, so only the heads above a fire discharge water.

Fire pump rooms

An electric main pump, a diesel standby pump and a jockey pump that keeps the system pressurised. The main pumps start automatically when pressure falls.

Fire alarm and detection

Addressable detectors and manual call points report to a panel that shows the exact device in alarm, with public address and voice evacuation.

Repair and maintenance (AMC)

Survey and repair of systems that are not working, then scheduled inspection and testing of pumps, valves, sprinklers and alarm panels, with service records after every visit.

Getting started

How to get a quote

Send us

✓

The building’s address and use (housing, offices, hospital, hotel, warehouse)

✓

Height and number of floors, including basements

✓

Built-up area

✓

Drawings, and the tender or BOQ if you have one

✓

Where you are: new building, fire NOC pending, or an existing system that needs repair or AMC

Send your requirement

What happens next

1

An FRS engineer surveys the site and checks the drawings against the fire approval conditions.

2

You receive an itemised quotation.

3

Before anything is ordered, we send you data sheets for the pumps, valves, sprinklers and panels for approval.

4

A project manager and engineers stay on site for the installation and send weekly progress reports.

5

We test and commission each system, then hand over the drawings and records.

FAQs

Questions from Noida building owners

It does if it is more than 15 m high, if it is a special building (educational, institutional, assembly, business, mercantile, industrial, storage or hazardous, as defined in the National Building Code), or if it is a mixed-use building with any of those uses over 500 sq m of covered area. That is section 26(3) of the Uttar Pradesh Fire and Emergency Services Act, 2022.
Uttar Pradesh Fire and Emergency Services, which calls it a Fire Safety Certificate. Most buildings are certified at district level, where the department lists a Chief Fire Officer for Gautam Buddh Nagar district; very tall or higher-risk buildings go to the fire region or the Director. You apply online at upfireservice.gov.in, which is linked to the Nivesh Mitra single-window portal. Only the owner, or a family member or regular employee holding a power of attorney, may pursue the application.
A proposed building first gets a Provisional Fire Safety Certificate after its drawings are checked and the site is inspected. The contractor then installs, tests and commissions the systems and hands over as-built drawings, equipment data sheets and test records, which the owner needs for the final certificate after a further inspection. The Act asks for the certificate to be issued within a month of a complete application, and no occupancy certificate is issued until the requirements are met.
Rule 44 of the 2024 Rules sets five years for residential buildings other than hotels, three for most other buildings, and one for hotels, hospitals, assembly buildings, hazardous storage and high-hazard industry. The state can change these periods, so check the expiry date on your certificate. Renew online a month before expiry, and every January and July file a maintenance declaration (Form A-8) certified by a licensed agency.
Yes. FRS installed the fire fighting system at the Noida Special Economic Zone (NSEZ) for NBCC, and completed three works in Varanasi for CPWD, at the Institute of Medical Sciences BHU, Banaras Hindu University and Kendriya Vidyalaya, DLW. It takes up installation and maintenance work across the state, including Greater Noida, Ghaziabad, Lucknow and Kanpur.
Yes. We start with a condition survey of the pumps, risers, sprinklers and alarm panels, list what is not working, and quote for the repairs and an annual maintenance contract. Service records are provided after every visit, so the maintenance history is ready when the January and July declarations are due.

Planning a fire fighting system for a building in Noida?

Send your drawings or a short description of the building. We will arrange a site survey and an itemised quotation.

Get a quote →